= included
= optional
= optional
= included = optional |
ProEco | ProBasic | ProEnergy | ProLife |
Application | ||||
---|---|---|---|---|
Length of application |
Length of application
Temporary solution
|
Length of application
Medium-term solution <2 years
|
Length of application
Permanent solution >2 years
|
Length of application
Permanent solution >2 years
|
Type of application |
Type of application
Construction site accommodation, construction site offices, sanitary containers, temporary solution for renovation or refurbising measures
|
Type of application
Office and administration buildings, schools or kindergartens as new buildings, extensions or annexes, site offices and site accommodation
|
Type of application
Office and administration buildings, schools or kindergartens as new buildings, extensions or annexes
|
Type of application
Office and administration buildings, schools or kindergartens as new buildings, extensions or annexes
|
Construction |
Construction
Galvanized welded steel frame, sandwich walls with PU core
|
Construction
Steel frame with profiled sheet metal walls
|
Construction
Steel frame with profiled sheet metal walls or cassette facade
|
Construction
Steel frame with aluminium composite panel and profiled sheet metal walls
|
Technical data | ||||
Type statics for |
Type statics for
3-storey
|
Type statics for
3-storey
|
Type statics for
3-storey
|
Type statics for
3-storey
|
Payload |
Payload
2,0 kN/m²
|
Payload
2,0–5,0 kN/m²
|
Payload
2,0–5,0 kN/m²
|
Payload
2,0 – 5,0 kN/m²
|
Snow load |
Snow load
1,0 kN/m²
|
Snow load
1,0–2,5 kN/m²
|
Snow load
1,0–2,5 kN/m²
|
Snow load
1,0 – 2,5 kN/m²
|
Fire protection |
Fire protection
|
Fire protection
F30 - F90 (optional)
|
Fire protection
F30 - F90 (optional)
|
Fire protection
F30 - F90 (optional)
|
Heat transfer coefficient | ||||
Roof |
Roof
U = 0,459 / 0,387 W/m²K
|
Roof
U = 0,506 / 0,452 W/m²K
|
Roof
U = 0,178 / 0,175 W/m²K
|
Roof
U = 0,347 / 0,280 W/m²K
|
Wall |
Wall
U = 0,380 / 0,380 W/m²K
|
Wall
U = 0,681 / 0,515 W/m²K
|
Wall
U = 0,232 / 0,184 W/m²K
|
Wall
U = 0,209 / 0,160 W/m²K
|
Floor |
Floor
U = 0,602 / 0,351 W/m²K
|
Floor
U = 0,611 / 0,299 W/m²K
|
Floor
U = 0,261 / 0,198 W/m²K
|
Floor
U = 0,293 / 0,203 W/m²K
|
Dimensions | ||||
Length |
Length
1,518 / 3,000 / 6,058 m
|
Length
3,000 - 12,192 m
|
Length
6,058 - 14,646 m
|
Length
6,058 - 14,646 m
|
Width |
Width
2,438 / 3,000 m
|
Width
2,500 / 3,000 m
|
Width
2,500 / 3,000 m
|
Width
3,000 m
|
External height |
External height
2,800 m
|
External height
2,800 m – other dimensions possible on request
|
External height
3,000 - 3,250 m – other dimensions possible on request
|
External height
3,150 - other dimensions possible on request
|
Clear room height |
Clear room height
2,500 m
|
Clear room height
2,500 m
|
Clear room height
2,500 - 2,750 m
|
Clear room height
2,750 m
|
Frames | ||||
Fully galvanized steel frame construction |
Fully galvanized steel frame construction
|
Fully galvanized steel frame construction
|
Fully galvanized steel frame construction
|
Fully galvanized steel frame construction
|
Welded steel frame, blasted and painted |
Welded steel frame, blasted and painted
|
Welded steel frame, blasted and painted
|
Welded steel frame, blasted and painted
|
Welded steel frame, blasted and painted
|
Roof | ||||
Galvanised profiled sheet and internal drainage |
Galvanised profiled sheet and internal drainage
|
Galvanised profiled sheet and internal drainage
|
Galvanised profiled sheet and internal drainage
|
Galvanised profiled sheet and internal drainage
|
Floor | ||||
Chipboard |
Chipboard
|
Chipboard
|
Chipboard
|
Chipboard
|
Plywood panel |
Plywood panel
|
Plywood panel
|
Plywood panel
|
Plywood panel
|
Cement-bonded chipboard |
Cement-bonded chipboard
|
Cement-bonded chipboard
|
Cement-bonded chipboard
|
Cement-bonded chipboard
|
GFK (glass fibre plastic) |
GFK (glass fibre plastic)
|
GFK (glass fibre plastic)
|
GFK (glass fibre plastic)
|
GFK (glass fibre plastic)
|
PVC |
PVC
|
PVC
|
PVC
|
PVC
|
Linoleum |
Linoleum
|
Linoleum
|
Linoleum
|
Linoleum
|
Carpet floors |
Carpet floors
|
Carpet floors
|
Carpet floors
|
Carpet floors
|
Exterior walls | ||||
Sandwich walls with PU core |
Sandwich walls with PU core
|
Sandwich walls with PU core
|
Sandwich walls with PU core
|
Sandwich walls with PU core
|
Exchangeable wall elements |
Exchangeable wall elements
|
Exchangeable wall elements
|
Exchangeable wall elements
|
Exchangeable wall elements
|
Galvanised profiled sheet |
Galvanised profiled sheet
|
Galvanised profiled sheet
|
Galvanised profiled sheet
|
Galvanised profiled sheet
|
Windows | ||||
Insulating glazing and external roller shutters |
Insulating glazing and external roller shutters
|
Insulating glazing and external roller shutters
|
Insulating glazing and external roller shutters
|
Insulating glazing and external roller shutters
|
Insulating glazing and external sun protection |
Insulating glazing and external sun protection
|
Insulating glazing and external sun protection
|
Insulating glazing and external sun protection
|
Insulating glazing and external sun protection
|
Interior cladding | ||||
Galvanised sheet steel, polyester-coated with magnetic surface |
Galvanised sheet steel, polyester-coated with magnetic surface
|
Galvanised sheet steel, polyester-coated with magnetic surface
|
Galvanised sheet steel, polyester-coated with magnetic surface
|
Galvanised sheet steel, polyester-coated with magnetic surface
|
with coated wood-based panels (Blue Angel certificate) |
with coated wood-based panels (Blue Angel certificate)
|
with coated wood-based panels (Blue Angel certificate)
|
with coated wood-based panels (Blue Angel certificate)
|
with coated wood-based panels (Blue Angel certificate)
|
with gypsum material plates, wallpaper and painting |
with gypsum material plates, wallpaper and painting
|
with gypsum material plates, wallpaper and painting
|
with gypsum material plates, wallpaper and painting
|
with gypsum material plates, wallpaper and painting
|
Electrics | ||||
CEE inlet and outlet with fuse box per container |
CEE inlet and outlet with fuse box per container
|
CEE inlet and outlet with fuse box per container
|
CEE inlet and outlet with fuse box per container
|
CEE inlet and outlet with fuse box per container
|
Central connection with main distribution and supply line through the floor |
Central connection with main distribution and supply line through the floor
|
Central connection with main distribution and supply line through the floor
|
Central connection with main distribution and supply line through the floor
|
Central connection with main distribution and supply line through the floor
|
Heating | ||||
Electric heating |
Electric heating
|
Electric heating
|
Electric heating
|
Electric heating
|
Infrared heating |
Infrared heating
|
Infrared heating
|
Infrared heating
|
Infrared heating
|
Gas heating and single stoves |
Gas heating and single stoves
|
Gas heating and single stoves
|
Gas heating and single stoves
|
Gas heating and single stoves
|
Central warm-water heating system |
Central warm-water heating system
|
Central warm-water heating system
|
Central warm-water heating system
|
Central warm-water heating system
|
Sanitation | ||||
Sanitary installation on plaster with visible pipe system |
Sanitary installation on plaster with visible pipe system
|
Sanitary installation on plaster with visible pipe system
|
Sanitary installation on plaster with visible pipe system
|
Sanitary installation on plaster with visible pipe system
|
Sanitary installation under plaster within facing walls, objects with flush-mounted mounting system |
Sanitary installation under plaster within facing walls, objects with flush-mounted mounting system
|
Sanitary installation under plaster within facing walls, objects with flush-mounted mounting system
|
Sanitary installation under plaster within facing walls, objects with flush-mounted mounting system
|
Sanitary installation under plaster within facing walls, objects with flush-mounted mounting system
|